|
|
|
|
|
|
Article 9 - Expenses, Travel and Standby Time |
|
|
|
|
|
9.01 On pipeline projects the time of
the shift shall start when the employees leave the warehouse
for the job site and shall end at quitting time on the job
site; however the lunch period shall be excluded. Should the
trip to the warehouse at the end of the shift exceed one-half
(½) hour the Employer shall pay the equivalent of one-half
(½) hour at straight time rates for each thirty (30) minutes
or portion thereof travelling in excess of thirty (30)
minutes.
See Appendices “D”
|
|
|
|
|
|
|